PSTN Project - Baalback  
  Description:
-Trench excavation over 1900 cu.m.
-Placement of over 8000lm PVC pipes
-Placement of 400 cu.m. of concrete
-Placement of 10 manholes and 20 handholes
-1800p*2000lm
-1400p*1120lm
- 200p* 500lm
- 70p* 650lm
- 30p* 300lm
- 10p* 400lm
-Installation of 25 cabinets


Home || About us || Engineering & Contracting || Infrastructure || Contact us

Copyright © 2009 BCC s.a.r.l All rights reserved Developed by Digital Mirror.